LA CONSTRUCTION DU TUNNEL FERROVIAIRE DE LA LIAISON PASSANTE FERROVIARO A MILAN
On a choisi un bouclier a pression de terre, plutot qu'un tunnelier avec soutenement du front ou bouclier a pression de boue. Le remplissage entre voussoirs et terrains a ete effectue par beton extrude pour limiter les tassements. (A). (Construction of railway tunnel for Milan Ferroviario passage link).
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/03990834
-
Authors:
- PERON, J Y
- MARCHESELLI, P
- Publication Date: 1995-3
Language
- French
Media Info
- Pagination: 130-8
-
Serial:
- TUNNELS ET OUVRAGES SOUTERRAINS
- Issue Number: 128
- Publisher: L'ASSOCIATION FRANCAISE DES TRAVAUX EN SOUTERRAIN
- ISSN: 0399-0834
Subject/Index Terms
- TRT Terms: Arches; Drilling; Emulsions; Full face tunneling; Ground settlement; Mucking; Pressure; Railroad tracks; Shielding (Tunneling); Timbering; Tunneling machines; Tunnels; Urban areas
- Uncontrolled Terms: Confinement; Injection (Materials)
- ITRD Terms: 3394: Avancement au bouclier; BETON EXTRUDE; 3605: Blindage (etai); 1062: Chemin de fer (voie); 4993: Emulsion de bitume; 3871: Forage (processus); 3617: Injection (mater); 3383: Machine a attaque globale; 5126: Marinage; 5412: Pression; 5792: Tassement; TERRE; 3374: Tunnel; 3373: Voute; 313: Zone urbaine
- Subject Areas: Bridges and other structures; Railroads; I54: Construction of Tunnels;
Filing Info
- Accession Number: 01231847
- Record Type: Publication
- Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
- Files: ITRD
- Created Date: Nov 19 2010 8:18PM