Amsterdam Bijlmer Arena Station

The old Amsterdam Bijlmer station was built in the early seventies and has two metro lines and two railway lines. As a result of the track doubling between Amsterdam and Utrecht, an additional four railway tracks need to be accommodated at this station. The capacity of the old station will then no longer be adequate to deal with the increasing number of passengers. The character of the new station needs to encompass the style and ambitions of the ArenA area in Amsterdam Zuidoost. This has been realized by combining a specific design with the most suitable materials and by integrating different functions. A prerequisite for the design is that the station has to be constructed while the trains continue to run and the passengers must be able to reach the trains in safety and with a minimum of inconvenience. As a result, it was decided to maximise the size of the prefab elements and minimize auxiliary structures for both the concrete and the steel structures.

  • Availability:
  • Supplemental Notes:
    • The DVD lists the title of the paper as “Station Amsterdam Bijlmer”.
  • Corporate Authors:

    International Association for Bridge and Structural Engineering

    ETH-Honggerberg, Wolfgang-Pauli-Strasse 15
    Zurich 8093,   Switzerland  CH-8093
  • Authors:
    • ten Voorde, Hans
    • van Weelden, Hans
    • Beersten, Harry
  • Conference:
  • Publication Date: 2007

Language

  • English

Media Info

  • Media Type: DVD
  • Edition: Volume 93
  • Features: Figures; Photos; Tables;
  • Pagination: 8p
  • Monograph Title: Improving Infrastructure Worldwide. IABSE Symposium Weimar 2007

Subject/Index Terms

Filing Info

  • Accession Number: 01226656
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Nov 18 2010 11:49AM