ALBERTA CUTS ERECTION TIME IN HALF BY PRECASTING PIER, DECK UNITS FOR BRIDGE

THIS REPORT OUTLINES THE USE OF PRECAST, PRESTRESSED COMPONENTS FOR PIER AND DECK CONSTRUCTION, FOR A 288-FT. LONG STRUCTURE /OVERPASS/ ON HIGHWAY 16 NEAR EDMONTON. ONSITE CONSTRUCTION TIME WAS REDUCED TO ABOUT HALF THAT OF CONVENTIONAL METHODS. COST WAS COMPARABLE WITH CONSTRUCTION OF STANDARD OVERPASS BRIDGES OF THE SAME SPAN RANGE. /CGRA/