USE OF PREFABRICATION IN ROAD CONSTRUCTION SHORTENS MOTORWAY REPAIR TIMES /IN GERMAN/

DURING THE LAST FIVE YEARS THE OLD CARRIAGEWAY ON LARGE SECTIONS OF THE BADEN WURTTEMBERG MOTORWAY HAS BEEN REPLACED BY PREFABRICATED PRESTRESSED SLABS, 10 CM LONG AND 18 CM THICK. THE CONSTRUCTION OF THE SLABS AND THE STRESSES ON THEM ARE DISCUSSED INCLUDING STRESSES AS A RESULT OF UNEVEN HEATING, WEIGHT AND TRAFFIC LOADING, AND ALSO THE PRESTRESSING OF THE SLABS. /FG/RRL/

  • Supplemental Notes:
    • Vol 110, No 22, PP 1000-1003, 5 PHOT, 6 REF
  • Publication Date: 1968

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00214965
  • Record Type: Publication
  • Source Agency: Road Research Laboratory /UK
  • Files: TRIS
  • Created Date: Apr 16 1970 12:00AM