ENGINEER TROOP TRAINING IN ENGLAND

A USABLE AMMUNITION DEPOT ROAD 18 FT. WIDE AND WITH A 6- IN. BASE WAS CONSTRUCTED. THE SANDY-CLAY MATERIAL ENCOUNTERED, CONTAINING 17% MOISTURE, WAS STABILIZED WITH 10% CEMENT BY WEIGHT.

  • Availability:
  • Supplemental Notes:
    • Vol 131, No 11, PP 394-396
  • Authors:
    • Bowman, W G
  • Publication Date: 1943-9-9

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00214862
  • Record Type: Publication
  • Source Agency: Highway Research Board Bibliography
  • Files: TRIS
  • Created Date: Feb 16 1970 12:00AM