Evaluation of I-80 Long-Life Corridor Costs

This technical memorandum summarizes the analysis performed in evaluating Long-Life Pavement Rehabilitation Strategies (LLPRS) cost. This study is part of the effort to develop an Integrated Pavement Strategy Decision Support System to allow engineers to analyze efficient allocation of financial resources when planning pavement projects. This study analyzed cost performances of a long-life pavement project on Interstate 80 between Nevada County (Truckee) from east of the Fireboard undercrossing to the west end of the Truckee River Bridge. The analysis performed determined that Contract Change Orders and the delays caused by them are the source of the cost overrun and the difference between the estimated and actual costs.

  • Record URL:
  • Corporate Authors:

    University of California, Berkeley

    Institute of Transportation Studies, Pavement Research Center
    1353 South 46th Street
    Richmond, CA  United States  94804

    University of California, Davis

    Pavement Research Center, One Shields Avenue
    Davis, CA  United States  95616
  • Authors:
    • Santero, Nicholas J
    • Nokes, W A
    • Harvey, John
  • Publication Date: 2005-6

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01152717
  • Record Type: Publication
  • Source Agency: UC Berkeley Transportation Library
  • Report/Paper Numbers: UCPRC-TM-2005-04
  • Files: BTRIS, TRIS
  • Created Date: Mar 8 2010 5:34PM