Taxiway Resurfacing - A Night in the Life of Taxiway Alpha

The author shares the events that unfolded during the late night of October 19 and early morning of October 20, 2009, at Glasgow International Airport as the alpha taxiway continued to be resurfaced and the airfield ground lighting system lying within it was replaced. These activities were part of the airport's ongoing investment in infrastructure. Issues discussed in the real-time context of the events outside the terminal include security, on-site operations, productivity, and switching between nighttime improvements and daytime airfield use.