INCREASING OIL LOADING AT A MARINE RELOADING BASE EQUIPPED WITH D-CMA (CHIKSAN) STANDPIPES

A description is given of the design and technical data of a new hose-pipe device and the conditions for the simultaneous (parallel) loading of several tankers that takes into account the operations of all the links of an automatic-delivery unified hydrodynamic system: delivery tank pool, intermediate buffer tanks, freight pipelines, standpipes at moorings, tanker pipeline system. Note is taken of the potentials for further increasing the loading of oil and greater freight handling of the reloading mooring complex.

  • Corporate Authors:

    Inst org, Upravleniia, Ekon Nefte promyshlenosti

    Moscow,   USSR 
  • Authors:
    • Yanov, B G
    • Stelanets, L G
    • Gross, S A
  • Publication Date: 1978

Language

  • Russian

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00195758
  • Record Type: Publication
  • Source Agency: Energy Research Abstracts
  • Files: TRIS
  • Created Date: Jul 31 1979 12:00AM