TUNNELLING - IMPROVED CONTRACT PRACTICES

This report considers risks in tunnel design and construction, and also the methods by which the Institution of Civil Engineers' form and other contract documents allocate responsibility for risk. The importance of the engineer's role is emphasised, as is the need for his independence to be preserved during the execution of the contract. The influence of the new civil engineering standard method of measurement, the role of insurance and the scope and status of site investigation for tunnelling are also considered, together with the question of means for the resolution of contractual disputes. /Author/TRRL/

  • Availability:
  • Corporate Authors:

    Construction Industry Research & Information Assoc

    6 Storey's Gate
    London SW1P 3AU,   England 
  • Publication Date: 1978-5

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00195467
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • ISBN: 086017 083 7
  • Report/Paper Numbers: Report No. 79 Monograph
  • Files: ITRD, TRIS
  • Created Date: Sep 15 1979 12:00AM