DETERMINATION OF WORKING TIMES FOR CONSTRUCTION WORK AND THEIR APPLICATION TO SIMULATION MODELS

ZUR ERMITTLUNG VON ARBEITSZEITEN IM BAUBETRIEB UND DEREN ANWENDUNG BEI SIMULATIONSMODELLEN

The processes known from the refa-method for the determination of working times are described systematically and by means of an example. The underlying principle for the simulation is based on an accurate demarcation of times and reference data, i.e. a precise formulation of the data to be determined, the collection of data itself and the evaluation of data. The application of strictly time-dependent simulation in construction work is demonstrated by examples of stochastic and deterministic flow models whereby there is also a demarcation with respect to the waiting queue method. The method of simulation where missing data can be substituted is only recommended for large construction projects (road construction works, barrages), where a large number of working processes with different factors repeat themselves. /TRRL/

  • Corporate Authors:

    Institut fuer Baubetrieb und Bauwirtschaft

    Argentinierstrasse 8
    A-M040 vienna,   Austria 
  • Authors:
    • Beisswenger, K
  • Publication Date: 1977-12

Language

  • German

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00195174
  • Record Type: Publication
  • Source Agency: Bundesanstalt für Straßenwesen (BASt)
  • Report/Paper Numbers: ANALYTIC
  • Files: ITRD, TRIS
  • Created Date: Aug 28 1979 12:00AM