A NEW PROBABILISTIC MODEL FOR THE PROGRAMMING OF WORKS BY MEANS OF PERT

UN NUOVO MODELLO PROBABILISTICO PER LA PROGRAMMAZIONE DEI LAVORI CON IL PERT

The methodology proposed, which is based on probabilistic algorithms, enables a new interpretation of the magnitudes "maximum anticipation time" and "maximum delay time" of an event, from which it is possible to derive a wider coverage of the degree of uncertainty of single events having their origins in the random duration of single activities. The proposed model is applicable to the programming of road construction and railway works. /TRRL/

  • Corporate Authors:

    Casa Editrice la fiaccola

    Via Carlo Ravizza 62
    Milano,   Italy 
  • Authors:
    • Diotto, G
    • Boscaino, G
  • Publication Date: 1978-10

Language

  • Italian

Media Info

  • Features: Figures; References;
  • Pagination: p. 949-965
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00193965
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: ITRD, TRIS
  • Created Date: May 26 1979 12:00AM