Construction of the Iowa Highway 60 Precast Prestressed Concrete Pavement Bridge Approach Slab Demonstration Project

Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.

Language

  • English

Media Info

  • Media Type: Print
  • Edition: Final Report
  • Features: Appendices; Figures; Photos; References; Tables;
  • Pagination: 98p

Subject/Index Terms

Filing Info

  • Accession Number: 01076680
  • Record Type: Publication
  • Report/Paper Numbers: IHRB Project HR-1085
  • Files: TRIS, USDOT, STATEDOT
  • Created Date: Sep 21 2007 1:55PM