Retrofitting of flyovers along major thoroughfares in metro Manila
The retrofitting of flyovers along major thoroughfares in Metro Manila was carried out by Angel Lazaro and Associates, Consulting Engineers and Architects, as part of the Sixth ADB Highway Project, Bridge Retrofitting Component, of the Department of Public Works and Highways (DPWH) of the Philippines. The retrofitting works were implemented between 1994 up to the present. The Bridge Retrofitting Component included the design and construction of a total of 174 bridges located in various parts of the country, many of which are standard rural highway bridges. T his paper describes the retrofitting process applied to the eleven major structures in Metro Manila comprising the project. (a) For the covering entry of this conference, please see ITRD abstract no. E214938.
-
Authors:
- LAZARO, A
- TUANO
- FABRO, A
- RAPIRAP, R
- Publication Date: 2006-11
Language
- English
Media Info
- Pagination: 28P
-
Serial:
- ROAD ENGINEERING ASSOCIATION OF ASIA AND AUSTRALASIA (REAAA) CONFERENCE, 12TH, 2006, PHILIPPINES
- Publisher: ROAD ENGINEERING ASSOCIATION OF THE PHILIPPINES
Subject/Index Terms
- TRT Terms: Bridges; Conferences; Construction; Developing countries; Highway design; Interchanges; Maintenance; Urban areas
- ITRD Terms: 3455: Bridge; 8525: Conference; 3655: Construction; 150: Developing countries; 2855: Highway design; 433: Interchange; 3847: Maintenance; 313: Urban area
- Subject Areas: Bridges and other structures; Construction; Design; Highways; Maintenance and Preservation; Planning and Forecasting; I21: Planning of Transport Infrastructure; I24: Design of Bridges and Retaining Walls;
Filing Info
- Accession Number: 01051064
- Record Type: Publication
- Source Agency: ARRB
- Files: ITRD, ATRI
- Created Date: Jun 11 2007 1:16PM