Final Report for NCHRP Report 581: Design of Construction Work Zones on High-Speed Highways

This document is the contractor's final report on the research activities used to develop NCHRP Report 581, "Design of Construction Work Zones on High-Speed Highways." NCHRP Report 581 explores an approach for the selection of an appropriate construction work zone type; offers suggested guidance for the design of geometric features, including horizontal and vertical alignment, cross-sectional features, and barrier placement; and examines a variety of ancillary features such as drainage systems, lighting, and surface type. As part of the research associated with this activity, a work zone prediction model and user's guide were created to help estimate free-flow vehicle speeds through two types of construction work zones on four lane freeways--single lane closures and median crossovers.

Language

  • English

Media Info

  • Media Type: Web
  • Edition: Contractor Final Report
  • Features: Figures; References; Tables;
  • Pagination: 116p
  • Serial:
  • Publication flags:

    Open Access (libre)

Subject/Index Terms

Filing Info

  • Accession Number: 01049430
  • Record Type: Publication
  • Report/Paper Numbers: NCHRP Project 3-69
  • Files: TRIS, TRB
  • Created Date: May 17 2007 11:36AM