PAVEMENTS IN COLD REGIONS

A test road section was constructed to compare standard construction techniques, using a granular base course between a subgrade highly susceptible to frost and the asphaltic concrete surface, with one in which a thick asphaltic concrete pavement was placed directly on a properly prepared subgrade. This latter method eliminated the cost of the granular base course, usually gravel and sand. The road consists of four sections each 50 feet long by 24 feet wide with a 4-foot shoulder on each side.

  • Corporate Authors:

    Society of Military Engineers

    800 17th Street, NW
    Washington, DC  USA  20006
  • Authors:
    • Eaton, R A
  • Publication Date: 1978-4

Media Info

  • Pagination: p. 106-108
  • Serial:
    • Military Engineer
    • Volume: 70
    • Issue Number: 454
    • Publisher: Society of Military Engineers

Subject/Index Terms

Filing Info

  • Accession Number: 00180082
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Oct 12 1978 12:00AM