THE TRANSPORTATION OF ENERGY COMMODITIES FOR THE APPALACHIAN REGION. VOLUME II. APPENDIX

Contents: Analysis zones used in the Appalachian Regional Commission (ARC) energy transportation study; Review of the ARC regional energy model; Determination of link costs; Computing link capacities; Determining resource requirements; Summary of transportation regulatory authority by state for all study area states; Program documentation; Coal slurry pipelines; Railroad system capacities; Mine mouth generation facilities. (Portions of this document are not fully legible)

  • Supplemental Notes:
    • Also available in set of 3 reports PC E12, PB-284 440-SET.
  • Corporate Authors:

    Ernst and Ernst

    1225 Connecticut Avenue, NW
    Washington, DC  USA  20036

    Appalachian Regional Commission

    1666 Connecticut Avenue, NW
    Washington, DC  USA  20235
  • Publication Date: 1978-4

Media Info

  • Pagination: 230 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00185962
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: ARC-76-86/CO4533-V2 Final Rpt.
  • Contract Numbers: ARC-76-86/CO-4533
  • Files: TRIS
  • Created Date: Dec 29 1979 12:00AM