PROGRAMMING OF TRACK SUPERSTRUCTURE AND FOUNDATION WORK ON THE DR

ZUR TECHNOLOGISCHEN PLANUNG VON OBERBAU- UND UNTERBAUARBEITEN BEI DER DEUTSCHEN REICHSBAHN

The technique used by the DR to improve track-foundation stability is based primarily on the laying of gravel or rocks and protection layers. The operation is conducted in three stages: preparation, infrastructure, track-laying, and each of these phases consists of several work stages.

  • Corporate Authors:

    Transpress VEB Verlag fuer Verkehrswesen

    Franzoesische Strasse 13/14, Postfach 1235
    108 Berlin,   Germany 
  • Authors:
    • Darr, E
  • Publication Date: 1977

Language

  • German

Media Info

  • Features: Figures; References;
  • Pagination: p. 406-407
  • Serial:
    • Signal und Schiene
    • Volume: 21
    • Issue Number: 12
    • Publisher: Transpress VEB Verlag fuer Verkehrswesen

Subject/Index Terms

Filing Info

  • Accession Number: 00178427
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Jul 19 1978 12:00AM