HIGHWAY WIDENING PROCEEDS BEHIND SEMI-PERMANENT MEDIAN BARRIER

Precast concrete median barrier curb is being used temporarily to protect both workmen and traffic through the 3.1-mile long construction zone of a widening project along the Garden State Parkway in Bergen County, New Jersey. The 51-in high precast curb units are placed directly on top and along the inside edge of the existing two-lane northbound and southbound roadways while construction proceeds within the media area to build one additional lane in each direction. The curb sections are interlocked end-to-end.

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00177337
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Sep 27 1978 12:00AM