MECHANIZATION OF CONSTRUCTION OF THE BAYKAL-AMUR RAILROAD

MEKHANIZATSIYA STROITEL'STVA BAIKALO-AMURSKOI MAGISTRALI

The construction of the Baikal-Amur main line involves building a line from Ust-Kut to Komsomolsk-on-the-Amur 3145 km long, the line Bam-Tynda-Berkakit 397 km long, and the second track on the Tayshet-Lena line 680 km long. About 200 stations, 142 large bridges (over 100 m long), and 27.1 km of tunnels are to be built. The article describes the machinery which is to be used in this undertaking and gives several photographs of the equipment to be used.