PREFABRICATED PRESTRESSED CONCRETE BRIDGES ON THE BELGRADE-BAR RAILWAY

PREFABRICIRANI PREDNAPREGNUTO-BETONSKI MOSTOVI NA ZELJEZNICKOJ PRUZI BEOGRAD - BAR

Four out of ninety eight bridges on a 116.9 km railway section between Gostum and Titograd are made of prefabricated prestressed concrete beams. All four structures were constructed by means of a launching device of domestic design and manufacture. The launching device MZM 30/500 can be used in erecting prefabricated bridge beams with a span of up to 30 M long and up to 500 T in weight. This device enabled the designers to change the original design intended for these bridges and use prefabricated prestressed concrete instead. The illustrations give details of the bridge. Data on all the bridges forming this section are given in a table.

  • Corporate Authors:

    Savez Gradjevinskih Inzenjera i Technicara

    Berislaviceva Ulica 6
    Zagreb, Croatia,   Yugoslavia 
  • Authors:
    • Milisic, M
  • Publication Date: 1977-10

Language

  • Croatian

Media Info

  • Features: Figures; Photos; Tables;
  • Pagination: p. 382-391
  • Serial:
    • Gradjeviner
    • Volume: 29
    • Issue Number: 10
    • Publisher: Drustvo gradevinskih inzenjera i technicara NRH

Subject/Index Terms

Filing Info

  • Accession Number: 00174020
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Report/Paper Numbers: Analytic
  • Files: ITRD, TRIS
  • Created Date: May 3 1978 12:00AM