FLEXIBILITY IS KEY IN OPERATIONS AT PARAMOUNT PLANT

Paramount Minerals Corp's. coal preparation plant, expected to be in operation by the year-end is highlighted here. Designed to receive coal feed from at least three different sources, the plant will be able to load raw or washed coal on two separate rail lines or, if preferred, simultaneously to load raw coal on one track, washed coal on another track and washed coal from two silos on a third track. Flow sheet for the fine coal preparation facilities is presented.

  • Corporate Authors:

    McGraw-Hill, Incorporated

    330 West 42nd Street
    New York, NY  United States  10036
  • Authors:
    • Arble, M
  • Publication Date: 1977-11

Media Info

  • Pagination: p. 76-79
  • Serial:
    • Coal Age
    • Volume: 82
    • Issue Number: 11
    • Publisher: McGraw-Hill, Incorporated

Subject/Index Terms

Filing Info

  • Accession Number: 00173585
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Apr 26 1978 12:00AM