LIMIT OF TRAFFIC LOAD CAPACITY FOR S 49 RAILS IN TRACKS AND SWITCHES

GRENZBELASTUNG DER SCHIENE S 49 IN GLEISEN UND WEICHEN

Owing to the increase in axle load, travelling speed and traffic volume, S 49 rails have in many cases reached the limit of their load-carrying capacity. The usual practice of evaluating the vertical and lateral wear of the rail head alone is no longer sufficient to determine the point in time at which the rails have to be replaced. The factors, ultimate traffic load capacity, type of track construction and behavior of rails not replaced in time, are discussed and explained by means of examples.

  • Availability:
  • Corporate Authors:

    Dr Arthur Tetzlaff Verlag

    Niddastrasse 64
    Frankfurt am Main,   Germany 
  • Authors:
    • Kraft, W
  • Publication Date: 1974

Language

  • German

Media Info

  • Features: Figures; References; Tables;
  • Pagination: p. 78-81
  • Serial:
    • Eisenbahningenieur
    • Volume: 25
    • Issue Number: 3
    • Publisher: Tetzlaff Verlag GmbH
    • ISSN: 0013-2810

Subject/Index Terms

Filing Info

  • Accession Number: 00172587
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Mar 14 1978 12:00AM