CONSTRUCTION-SITE NOISE CONTROL COST-BENEFIT ESTIMATING PROCEDURES
This report aids the U.S. Army Corps of Engineers construction cost estimator in determining the level of noise generated at construction sites, in comparing this level with Corps of Engineers criteria, and in estimating costs to a contractor of reducing the noise. A companion report, Construction-Site Noise Control-Cost-Benefit Estimation Technical Background, Technical Report N-37 (U.S. Army Construction Engineering Research Laboratory (CERL), January 1978), contains the rationale and data supporting this report. (Author)
-
Corporate Authors:
Army Construction Engineering Research Laboratory
P.O. Box 4005
Champaign, IL United States 61820 -
Authors:
- Kessler, F M
- Schomer, P D
- Chanaud, R C
- Rosendahl, R
- Publication Date: 1978-1
Media Info
- Pagination: 35 p.
Subject/Index Terms
- TRT Terms: Backfilling; Barriers (Roads); Benefit cost analysis; Concrete; Construction equipment; Construction sites; Cost estimating; Earthwork; Effective sound pressure; Estimates; Estimating; Excavating equipment; Foundations; Location; Noise control; Plywood; Specifications; Trenching
- Uncontrolled Terms: Barriers; Building sites; Modifications; Noise reduction
- Old TRIS Terms: Backfills; Foundations structures; Substitutes
- Subject Areas: Construction; Highways;
Filing Info
- Accession Number: 00176059
- Record Type: Publication
- Source Agency: National Technical Information Service
- Report/Paper Numbers: CERL-IR-N-36 Intrm Rpt.
- Files: TRIS
- Created Date: Jul 19 1978 12:00AM