REVERSIBLE SIGNALLING AS SUPPLIED ON THE WESTERN REGION BETWEEN DIDCOT AND BRISTOL

Outlines the need for reversible working over long sections of a double line railway following the introduction of high-speed services. The possible solutions are considered and the final arragements detailed with reference to the problems, including the safety of staff working on the track, which had to be resolved.

  • Corporate Authors:

    Institution of Railway Signal Engineers

    London,   England 
  • Authors:
    • Openshaw, V K
  • Publication Date: 1978-1-4

Media Info

  • Features: Photos;
  • Pagination: 12 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00173436
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Apr 26 1978 12:00AM