LNG TERMINAL WILL EASE GAS SHORTAGE

This article describes a 1-billion-cfd base-load LNG receiving and regasification terminal which is nearing completion at Cove Point, Md. Initially, the terminal will handle 650 MMscfd of gas. A new 36-in. pipeline carrying regasified LNG inland that features dual computer-controlled measuring and regulating stations for BTU calculations and delivery is also described. A fleet of nine 125,000-cu-m tankers will be used for transporting the LNG to the new terminal. Basic components and functions of the terminal are discussed and the terminal loading scheme is presented graphically.

  • Availability:
  • Corporate Authors:

    Petroleum Publishing Company

    211 South Cheyenne, P.O. Box 1260
    Tulsa, OK  United States  75221
  • Authors:
    • LEVY, M M
  • Publication Date: 1976-6-21

Media Info

  • Serial:
    • Oil and Gas Journal
    • Volume: 74
    • Issue Number: 25
    • Publisher: PennWell Publishing Company
    • ISSN: 0030-1388

Subject/Index Terms

Filing Info

  • Accession Number: 00147813
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Feb 16 1977 12:00AM