SERVICE LOAD AND FATIGUE TESTS ON TRUSS BRIDGES
With the construction of the Saylorville Dam and Reservoir on the Des Moines River in Iowa, six highway bridges were scheduled for removal. Two of these were incorporated into a comprehensive test program to study the behavior of old pin-connected high-truss single-lane bridges. The test program consisted of ultimate load tests, service load tests, and a supplementary static and fatigue testing program of selected members. The results reported in this paper cover the service load tests on the two bridges as well as the supplementary tests, both static and fatigue, of eyebar members taken from the two bridges at the time of removal. The field test results of the service loading are compared with theoretical results of the truss analysis.
-
Corporate Authors:
American Society of Civil Engineers
345 East 47th Street
New York, NY United States 10017-2398 -
Authors:
- Elleby, H A
- Sanders Jr, W W
- Klaiber, F W
- Reeves, M D
- Publication Date: 1976-12
Media Info
- Pagination: p. 2285-00
-
Serial:
- Journal of the Structural Division
- Volume: 102
- Issue Number: ST12
- Publisher: American Society of Civil Engineers
Subject/Index Terms
- TRT Terms: Bars (Building materials); Breaking loads; Bridge design; Bridges; Fatigue (Physiological condition); Fatigue tests; Loads; Oversize loads; Static tests; Structural design; Tests; Truss bridges; Trusses
- Uncontrolled Terms: Eyebars; Overloads
- Subject Areas: Bridges and other structures; Highways;
Filing Info
- Accession Number: 00149378
- Record Type: Publication
- Source Agency: American Society of Civil Engineers
- Report/Paper Numbers: Proc. Paper 12625
- Files: TRIS
- Created Date: Apr 27 1977 12:00AM