BALLASTLESS TRACK IN TUNNELS

SCHOTTERLOSER OBERBAU IM TUNNEL

Different types of experimental ballastless track were laid in two tunnels in connection with the electrification of the Heidelberg-Wurtzburg line to avoid changing the arch and the foundation raft in the tunnels despite the different clearances required. The authors describe the experience gained from this project and the sound insulation measures taken.

  • Availability:
  • Corporate Authors:

    Dr Arthur Tetzlaff Verlag

    Niddastrasse 64
    Frankfurt am Main,   Germany 
  • Authors:
    • Osswald, R
    • Solf, H
  • Publication Date: 1976-9

Language

  • German

Media Info

  • Features: Figures; References; Tables;
  • Pagination: p. 354-362
  • Serial:
    • Eisenbahningenieur
    • Volume: 27
    • Issue Number: 9
    • Publisher: Tetzlaff Verlag GmbH
    • ISSN: 0013-2810

Subject/Index Terms

Filing Info

  • Accession Number: 00148832
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Files: TRIS
  • Created Date: Mar 15 1977 12:00AM