ITS EARLY DEPLOYMENT PROGRAM : I-90 SEATTLE TO SPOKANE : TECHNICAL MEMORANDA

The I-90 Seattle to Spokane study is intended to provide the Washington State Department of Transportation (WSDOT) with an implementation plan for the deployment of ITS technologies along I-90 from Seattle to Spokane. The study follows the guidance set forth by the WSDOT "Venture" program in providing a fully integrated state-wide transportation system on the roadways within WSDOTs jurisdiction. The study focused on specific applications in the areas of traffic management, traveler information, emergency management, and commercial vehicle operations (CVO) with the emphasis on providing specific projects to be deployed throughout the corridor. As a result of this study, fourteen project prospectuses that address the corridor transportation needs have been prepared. Each prospectus includes a project description, cost estimate, and an implementation schedule The corridor study included the seven project tasks summarized here

  • Record URL:
  • Record URL:
  • Supplemental Notes:
    • Publication Date: 1998. Joint Program Office for Intelligent Transportation Systems Washington DC. Format: website
  • Corporate Authors:

    Washington State Department of Transportation

    Transportation Building, 310 Maple Park Avenue SE, P.O. Box 47300
    Olympia, WA  United States  98504-7300

    Parsons Brinckerhoff, Incorporated

    One Penn Plaza
    New York, NY  United States  10119

    PB Farradyne

    444 South Flower Street, Suite 3700
    Los Angeles, CA  United States  90071
  • Publication Date: 1998

Language

  • English

Media Info

  • Media Type: Digital/other

Subject/Index Terms

Filing Info

  • Accession Number: 00962449
  • Record Type: Publication
  • Source Agency: UC Berkeley Transportation Library
  • Files: PATH, NTL, STATEDOT
  • Created Date: Sep 2 2003 12:00AM