CONSTRUCTION MONITORING AND PROCEDURES FOR I-275 "WARRANTY PROJECT" KENTON/BOONE COUNTIES

In the summer of 2000, it was decided by the Kentucky Transportation Cabinet (KTC) that a portion of eastbound and westbound I-275 needed repair due to fatigue. The design was 10 in. portland cement concrete (PCC) or 13 in. of asphaltic concrete (AC) for Section B, and 9 in. PCC or 12 in. of AC for Section A. Alternate bids were accepted from asphalt and concrete contractors with a required warranty of 10 years or 10,000,000 ESALs, whichever came first. The KTC will be monitoring the performance of the pavement for the duration of the warranty and will be submitting an annual report showing any distress. The report details the construction process and shows just a few of the minor problems that were encountered after the completion of construction.

Language

  • English

Media Info

  • Features: Figures; Photos; Tables;
  • Pagination: 37 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00960045
  • Record Type: Publication
  • Report/Paper Numbers: KTC-01-29/FR107-01-1I,, Interim Report
  • Files: NTL, TRIS, USDOT, STATEDOT
  • Created Date: Jul 8 2003 12:00AM