THE CEL 100K PROPELLANT ANCHOR - UTILIZATION FOR TANKER MOORINGS IN SOFT CORAL AT DIEGO GARCIA
This report documents the design of the CEL 100K Propellant Anchor, and outlines the mooring requirements and designs as well as the procedures, equipment, and operations involved in installing the propellant anchors and connective gear for tanker moorings at Diego Garcia. This successful installation demonstrated that this type of anchor can be used to advantage in Navy and other applications, particularly where uplift-resistance is desired or where effective anchoring is needed in a hard seafloor. (Author)
-
Corporate Authors:
Naval Civil Engineering Laboratory
Point Mugu
Port Hueneme, CA United States 93041 -
Authors:
- True, D G
- Taylor, R J
- Publication Date: 1976-7
Media Info
- Pagination: 33 p.
Subject/Index Terms
- TRT Terms: Anchoring; Anchors (Mooring devices); Anchors (Structural connectors); Mooring; Moorings
- Old TRIS Terms: Anchor structures; Embedment anchors
- Subject Areas: Marine Transportation; Terminals and Facilities;
Filing Info
- Accession Number: 00144373
- Record Type: Publication
- Source Agency: National Technical Information Service
- Report/Paper Numbers: CEL-TN-1446 Final Rpt.
- Files: TRIS
- Created Date: Jan 16 1977 12:00AM