SUBSURFACE INVESTIGATION, SECTION F003, BRANCH ROUTE

Results are summarized of thirteen supplementary borings made at the location of sewer crossings on M street in southeast Washington, District of Columbia and at selected locations within the Washington Naval Shipyard. The borings were performed to investigate conditions at the planned crossing of the subway tunnels beneath the M Street sewers and to ascertain the character of deep bearing strata for high-load underpinning piles to be installed within the Navy Yard. The report contains geological sections incorporating the new borings, logs of these borings, results of laboratory tests on soil samples obtained and a discussion of anticipated design and construction problems. This investigation is for the Washington Area Metro System.

  • Supplemental Notes:
    • Sponsored in part by Washington Metropolitan Area Transit Authority, D.C.
  • Corporate Authors:

    Mueser, Rutlege, Wentworth and Johnston

    415 Madison Avenue
    New York, NY  United States  10314

    Washington Metropolitan Area Transit Authority

    600 Fifth Street, NW
    Washington, DC  United States  20001
  • Publication Date: 1976-7-14

Media Info

  • Pagination: 56 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00143760
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: MRWJ-76-148, Rept. No. 8
  • Files: TRIS
  • Created Date: Nov 17 1981 12:00AM