BUILDING A TRUNK ROUTE FOR HEAVY FREIGHT AND PASSENGERS
Polish State Railways is constructing a new trunk line, a 223-km double-track artery linking the nation's major coalfield and industrial area with Warsaw and eventually with the Baltic ports. It has been planned to accommodate heavy freight movements as well as passenger trains running at 200 km/h. Standard concrete components were designed in various dimensions to fit almost all the structures required--culverts and bridges. The line is being electrified.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/03735346
-
Corporate Authors:
IPC Transport Press, Limited
Dorset House, Stamford Street
London SE1 9LU, England -
Authors:
- Basiewicz, T
- Publication Date: 1977-10
Media Info
- Features: Photos;
- Pagination: p. 373-375
-
Serial:
- Railway Gazette International
- Volume: 133
- Issue Number: 10
- Publisher: DVV Media Group
- ISSN: 0373-5346
- Serial URL: http://www.railwaygazette.com/about-us.html
Subject/Index Terms
- TRT Terms: Bridge design; Bridges; Concrete bridges; High speed track; Standardization; Structural design; Unit trains
- Identifier Terms: Polskie Koleje Panstwowe
- Subject Areas: Bridges and other structures; Railroads;
Filing Info
- Accession Number: 00167510
- Record Type: Publication
- Source Agency: Railway Gazette International
- Files: TRIS
- Created Date: Dec 27 1977 12:00AM