INSTALLATION OF REMOTE COMPUTER CONTROL BETWEEN MUNICH, PASING AND TUTZING
AUFBAU DER RECHNER-FERNSTEUERUNG MUENCHEN-PASING-TUTZING
On this line in the Munich area, a central control post for operating purposes is being built using, for the first time, the basic principles recommended by the Working Party responsible for planning the system of central operating control, set up by the DB. This article describes the purpose of the main parts of the system. The design is in accordance with a future standard of the BSZ (Central Operating Control) for a Siemens S.A. type of construction.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/00374997
-
Corporate Authors:
Dr Arthur Tetzlaff Verlag
Niddastrasse 64
Frankfurt am Main, Germany -
Authors:
- Heissmann, R
- Ritt, E
- Publication Date: 1977-3
Language
- German
Media Info
- Features: Figures; Photos; References;
- Pagination: p. 45-53
-
Serial:
- Signal und Draht
- Volume: 69
- Issue Number: 3
- Publisher: Tetzlaff Verlag GmbH
- ISSN: 0037-4997
Subject/Index Terms
- TRT Terms: Centralized traffic control; Control systems; Standardization; Traffic signal control systems
- Old TRIS Terms: Signal systems
- Subject Areas: Operations and Traffic Management; Railroads;
Filing Info
- Accession Number: 00163238
- Record Type: Publication
- Source Agency: International Union of Railways
- Files: TRIS
- Created Date: Oct 13 1977 12:00AM