NEW METHOD DIGS DEEP FOR AGGREGATES

Requirements for a dredge capable of dredging to a depth of up to 80 feet and producing approximately 350 tons-per-hour through as much as 1500 feet of discharge line terminating 65 feet above ground water level at the top of separation plant are discussed.

  • Corporate Authors:

    World Trade Publications, Incorporated

    P.O. Box 269
    San Pedro, CA  United States  90733
  • Authors:
    • Binkley, J D
  • Publication Date: 1976-12

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00153218
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Jun 17 1977 12:00AM