A STUDY ON PRE-ERECTION SYSTEM IN HULL CONSTRUCTION

Proceedings from a discussion of the basic erection procedures in shipbuilding, the paper presents a comparative study of floating and non-floating transfer systems for pre-erected sections. It is shown that pre-erection by the floating transfer method does not permit large scale production and also poses problems where levelling off of man-hours is concerned. For pre-erection by the non-floating transfer method, a calculation procedure is developed, relating length of the pre-erection dock to the productive capacity. The basic requirements of a mechanical transfer device are outlined and the fundamental design of the system adopted by Mitsubishi Heavy Industries is described.

  • Corporate Authors:

    Society of Naval Architects of Japan

    23 Shiba-kotohiracho, Minato-ku
    Tokyo 135,   Japan 
  • Authors:
    • Takezawa, I
    • Muto, M
    • Kanezaki, A
  • Publication Date: 1974

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00153032
  • Record Type: Publication
  • Source Agency: British Ship Research Association
  • Files: TRIS
  • Created Date: May 11 1977 12:00AM