LARGE BORED PILES FOR THE SUBSTRUCTURE OF A RAILROAD BRIDGE

GROSSBOHRPFAEHLE FUER DEN UNTERBAU EINER EISENBAHNBRUECKE

Special practical, static and construction-technological requirements, posed by the method of construction without an excavation, that called for utilization of special structural capacity of the foundations and substructures for the installation of pile walls are discussed.

  • Corporate Authors:

    VEB Autobahnbaukombinat

    Templinestrasse 19
    Potsdam,   Germany 
  • Authors:
    • Niemsch, H
    • Robinski, G
  • Publication Date: 1976-9

Language

  • German

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00152599
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: May 31 1977 12:00AM