DISPLACEMENT OF ADJACENT ROADWAY AND GROUND SURFACE DURING CONSTRUCTION PERIOD OF OPEN CAISSON

As the open caisson pier foundation was to be constructed very close to the existing roadway of embankment of weak strata in recent double tracking work on Chuoh line, observation of displacement was carried out to judge the degree of danger for running a train during construction period. According to the results of observation it was confirmed that the protection method by sheet piling was very effective and in this case the displacements or strains were too small to disturb the track or to interrupt the traffic.

  • Availability:
  • Corporate Authors:

    JAPANESE NATIONAL RAILWAYS

    TOKYO,   Japan 
  • Authors:
    • Muromachi, T
    • Komine, T
    • YASUDA, Y
  • Publication Date: 1967-9

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00033160
  • Record Type: Publication
  • Report/Paper Numbers: Quart Rpt
  • Files: TRIS
  • Created Date: Jun 16 1976 12:00AM