POWER SYSTEM SUPPLY IN YAMANASHI MAGLEV TEST LINE

The development of the superconducting magnetic levitation system has been progressing in Japan. A new test line (Yamanashi test line) is under construction in Yamanashi prefecture. Most facilities for the power supply system to drive the LSM have been installed in the power conversion station and beside the guideway. And various adjustments have been installed in the power conversion station and beside the guideway. And various adjustments have been started at each facility. This paper introduces the configuration of the power supply system and the main functions of each facility of the power supply system on the new test line.

  • Availability:
  • Corporate Authors:

    Railway Technical Research Institute

    2-8-38, Hikari-cho, Kokubunji-shi
    Tokyo 185,   Japan 
  • Authors:
    • Kawaguchi, I
    • Ikeda, H
    • Kaga, S
    • Ohtsuki, H
  • Publication Date: 1996-9

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00731991
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Feb 12 1997 12:00AM