REPLACEMENT OF MOTORWAY OVERBRIDGES MAINTAINING CONTINUOUS MOTORWAY TRAFFIC

This paper describes a method of replacing motorway overbridges whilst maintaining continuous motorway traffic, which is carried on temporary viaducts above the level of the overbridge. The demolition and construction of the new bridge is carried out by traditional methods below and free from traffic interruption. It reduces the cost considerably and removes the aggravation of the travelling public. (A) For the covering abstract see IRRD 882313.

Language

  • English

Media Info

  • Features: References;
  • Pagination: p. 385-92

Subject/Index Terms

Filing Info

  • Accession Number: 00729479
  • Record Type: Publication
  • Source Agency: Transport Research Laboratory
  • ISBN: 0-419-21210-8
  • Files: ITRD
  • Created Date: Dec 26 1996 12:00AM