EVALUATION FINDINGS: THE SEGMENTAL CONCRETE CHANNEL BRIDGE SYSTEM
In 1994, the Highway Innovative Technology Evaluation Center (HITEC) undertook a technical evaluation of the JMI Channel Bridge, a precast segmental overpass bridge system intended for use in either bridge replacement projects or new construction. A technical evaluation plan was developed in June 1995, consisting of two components: (1) Technical analyses and evaluation of design attributes and performance history, with emphasis on the unique aspects of this technology; and (2) A full-scale demonstration of the technology. This report contains the findings of technical analyses and evaluation of the Channel Bridge.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/0784401578
-
Corporate Authors:
Highway Innovation Technology Evaluation Center
HITEC c/o CERF, 1015 15th St, NW, Ste 600
Washington, DC United States 20005 - Publication Date: 1996-3
Language
- English
Media Info
- Features: Appendices; Figures; References; Tables;
- Pagination: 33 p.
Subject/Index Terms
- TRT Terms: Bridge design; Bridges; Design; Equipment replacement; Evaluation; Overpasses; Performance; Precast concrete; Segmental construction; Structural design; Technology assessment
- Old TRIS Terms: Replacements; Technical analysis
- Subject Areas: Bridges and other structures; Design; Highways; Maintenance and Preservation; I24: Design of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00728610
- Record Type: Publication
- ISBN: 0784401578
- Report/Paper Numbers: CERF Report:HITEC 96-01
- Files: TRIS
- Created Date: Nov 19 1996 12:00AM