SEA TRIALS FOR EURODYN GAS TURBINE

The Eurodyn gas turbine has been installed in a 37 m high- speed catamaran which will act primarily as a floating test bed for the gas turbine. A full-size Eurodyn prototype has been running on a test bed in France since October 1992. Results to date indicate that these test engines have achieved efficiencies of 32.8% at an output of 2.6 MW. The gas turbine is designed to provide some 9000 hours of operation between overhauls, effectively giving a typical fast ferry application something like three years of operation.

  • Supplemental Notes:
    • Diesel & Gas Turbine Worldwide, v 27 n 3, April 1995, p 34 [2 p, 4 fig]
  • Authors:
    • Kunberger, K
  • Publication Date: 1995

Language

  • English

Subject/Index Terms

Filing Info

  • Accession Number: 00710858
  • Record Type: Publication
  • Source Agency: British Maritime Technology
  • Files: TRIS
  • Created Date: Aug 14 1995 12:00AM