MACHINE PERFORMANCE DATA RECORDED DURING THE CHINNOR TUNNELLING TRIALS

This report presents the data collected on the performance of the 5 metre diameter tunnelling machine used to drive the experimental tunnel 210 metres long, in the lower chalk formation. /Author/TRRL/

  • Corporate Authors:

    Transport and Road Research Laboratory (TRRL)

    Wokingham, Berkshire  United Kingdom 
  • Authors:
    • SNOWDON, R A
  • Publication Date: 1976

Media Info

  • Features: Figures; References; Tables;
  • Pagination: 12 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00137748
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Report/Paper Numbers: Supp. Rpt. 196 UC
  • Files: ITRD, TRIS
  • Created Date: Apr 13 1977 12:00AM