MACHINE PERFORMANCE DATA RECORDED DURING THE CHINNOR TUNNELLING TRIALS
This report presents the data collected on the performance of the 5 metre diameter tunnelling machine used to drive the experimental tunnel 210 metres long, in the lower chalk formation. /Author/TRRL/
-
Corporate Authors:
Transport and Road Research Laboratory (TRRL)
Wokingham, Berkshire United Kingdom -
Authors:
- SNOWDON, R A
- Publication Date: 1976
Media Info
- Features: Figures; References; Tables;
- Pagination: 12 p.
Subject/Index Terms
- TRT Terms: Chalks; Data collection; Drilling; Economic efficiency; Equipment; Experiments; Tunneling; Tunneling machines; Tunnels
- Uncontrolled Terms: Efficiency
- ITRD Terms: 4120: Chalk; 8623: Data acquisition; 3871: Drilling; 5911: Efficiency; 3674: Equipment; 3374: Tunnel
- Subject Areas: Bridges and other structures; Construction; Economics; Highways; Vehicles and Equipment; I54: Construction of Tunnels;
Filing Info
- Accession Number: 00137748
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Report/Paper Numbers: Supp. Rpt. 196 UC
- Files: ITRD, TRIS
- Created Date: Apr 13 1977 12:00AM