EXPERIENCE WITH COMPUTER-AIDED DRAFTING SYSTEM

The paper describes in general terms for mechanizing the production of detail drawings and schedules for reinforced concrete building structures, using a digitizer, a visual display unit, and an incremental plotter. Information is given for estimating the cost of a typical example of actual production work. It is possible to introduce a considerable degree of mechanization into the production of detailed drawings of buildings, and the costs can compare favorably with those of manual methods of drawing production. There are particular advantages when the production of a drawing is linked with the compilation of a schedule of components, such as the detailing of concrete reinforcement, and also when details prepared for one set of detail drawings can be used as the basis of subsequent sets of details - for instance when the concrete outline is used as the basis of the layouts of the nonstructural walls and partitions.

  • Supplemental Notes:
    • Presented at the ASCE Sixth Conference on Electronic Computation, Atlanta, Georgia, August 7-9, 1974.
  • Corporate Authors:

    American Society of Civil Engineers

    345 East 47th Street
    New York, NY  USA  10017-2398
  • Authors:
    • Williams, GMJ
  • Publication Date: 1975-4

Media Info

  • Features: Appendices; Figures; Photos; References; Tables;
  • Pagination: p. 649-660
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00096123
  • Record Type: Publication
  • Report/Paper Numbers: ASCE 11224 Proc Paper
  • Files: TRIS
  • Created Date: Jul 2 1975 12:00AM