RAILWAY SERVICES COVERING THE NEW TOWN OF EVRY

DESSERTE FERROVIAIRE DE LA VILLE NOUVELLE D'EVRY

This detailed memorandum explains the stage reached in the infrastructure work for construction of the line from Grigny to Corbeil via Evry. Electrified with 1500 V direct current, this 10.7 km line, which is a diversion from the main Paris-Corbeil route, is designed to serve 14 localities through 4 stations. The report includes numerous statistical data on the geological studies covering the site, the constraints imposed by urbanization of the region served and various details relating to the civil engineering work and the buildings intended for passengers and operation of the line.

  • Corporate Authors:

    Societe Nationale des Chemins de Fer Francais

    92 rue Bonaparte
    75 Paris 6e,   France 
  • Authors:
    • Gambart, H
  • Publication Date: 1974-6

Language

  • French

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00095381
  • Record Type: Publication
  • Source Agency: International Railway Documentation, Selection of
  • Files: TRIS
  • Created Date: Jul 15 1981 12:00AM