COMPUTE EARTHWORK QUANTITIES

File name is ENCOQ. Program will compute earthwork quantities in cubic yards by the average end area method when cross section data are given as coordinates of points around the perimeters of the sections. Elevations: either real or hypothetical, are the vertical coordinates; while distance, left or right, from a fixed base line are the horizontal coordinates. Input: In addition to section data, consists of engineering station and specific identification data such as whether the section is in cut or fill; a repeat section; 0.0 section; etc. Output: In addition to user identification, job description and section data as input, will contain end areas, accumulated volumes and total quantities.

  • Corporate Authors:

    Atchison, Tokeka and Santa Fe Railway

    9th and Jackson Streets, Information Systems Department
    Topeka, KS  USA  66628
  • Authors:
    • Robinson, R E
  • Publication Date: 1968

Subject/Index Terms

Filing Info

  • Accession Number: 00098779
  • Record Type: Publication
  • Source Agency: American Railway Engineering Association
  • Files: TRIS
  • Created Date: Aug 27 1975 12:00AM