COMPACTION, MONITORING AND PERFORMANCE OF ENGINEERED FILL AT THE DIXON OPENCAST SITE, CHESTERFIELD, UK
Two areas within the major Dixon opencast site at Brimington, near Chesterfield, England, required engineering compaction in order to permit the construction of an industrial development and by-pass. The paper describes the approach to compaction trials, monitoring of compaction and instrumentation, which comprised the installation of surface monuments, magnetic extensometers, piezometers and a United States Bureau of Reclamation (USBR) gauge. The results of settlement monitoring for a period of up to 1700 days are described. (A) For the covering abstract see IRRD 859718.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/072771967X
-
Corporate Authors:
Thomas Telford Limited
London, United Kingdom -
Authors:
- TRENTER, N A
- Conference:
- Publication Date: 1993
Language
- English
Media Info
- Features: References;
- Pagination: p. 455-69
Subject/Index Terms
- TRT Terms: Compaction; Conferences; Earthwork; Fills; Geology; Ground settlement; Groundwater; Land reclamation; Mines; Motion; Road construction; Surveillance
- Uncontrolled Terms: Fill (Embankment)
- ITRD Terms: 5904: Compaction (state of); 8525: Conference; 3653: Earthworks; 2801: Embankment; 4053: Geology; 4383: Ground water; 5117: Mine; 5483: Movement; 3631: Reclamation (land); 3665: Road construction; 5792: Settlement; 9101: Surveillance
- Subject Areas: Construction; Data and Information Technology; Geotechnology;
Filing Info
- Accession Number: 00641037
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- ISBN: 0-7277-1967-X
- Files: ITRD
- Created Date: Jan 24 1994 12:00AM