U.S. 75 NORTH CENTRAL EXPRESSWAY RECONSTRUCTION: NORTHWEST HIGHWAY SCREEN LINE AUTOMOBILE AND TRANSIT USER PANELS, MAY 1991 SURVEY RESULTS. INTERIM REPORT

This report summarizes the results of the survey of the North Central Expressway automobile and transit panelists conducted in May 1991. The results of the survey indicate that travel patterns in the corridor have not deteriorated significantly since the start of Expressway construction south of I-635. Panelists did report a slight reduction in the frequency of use of the Expressway. In addition, panelists indicated that they were leaving home for work approximately 5 minutes earlier than they did before construction began. However, travel times reported by panelists has not increased, and total tripmaking frequency in the corridor has not changed. Other details regarding the survey analysis and results are presented herein.

  • Supplemental Notes:
    • Study title: Highway Planning and Operations for District 18.
  • Corporate Authors:

    Texas Transportation Institute

    Texas A&M University System, 1600 E Lamar Boulevard
    Arlington, TX  United States  76011

    Texas Department of Transportation

    Transportation Planning Division, P.O. Box 5051
    Austin, TX  United States  78763
  • Authors:
    • Ullman, G L
    • Krammes, R A
  • Publication Date: 1991-11

Language

  • English

Media Info

  • Features: Figures; References; Tables;
  • Pagination: 32 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00625212
  • Record Type: Publication
  • Report/Paper Numbers: TX-92/984-4, Res Rept 984-4, TTI: 2-18D-90/91-984
  • Contract Numbers: Study 2-18D-90/91-984
  • Files: TRIS, STATEDOT
  • Created Date: Oct 27 1993 12:00AM