CONSTRUCTION OF THE RIVER BRIDGE PILES ON THE SEREMBAN-AYER HITAM MOTORWAY IN MALAYSIA

IZVODJENJE RECNIH STUBOVA NA MOSTOVIMA AUTO-PUTA SEREMBAN-AYER HITAM U MALEZIJI

The article describes the construction of the river piles on three bridges in the motorway roadbed. Local design conditions were very complex and required special examinations and technical preparations. The construction method used for the upper parts of piles gave considerable savings in comparison with other solutions. On the upper part of the steel pile, 610 mm in diameter, a prefabricated reinforced concrete covering pipe was placed. The bridges were constructed in 1987. (TRRL)

  • Availability:
  • Corporate Authors:

    Savez Gradjevindkih Inzenjera I Tehnicara Jugoslav

    Kneza Milosa 9
    Beograd, Serbia,   Yugoslavia 
  • Authors:
    • Radojevic, M
    • Spirovski, S
  • Publication Date: 1988

Language

  • Serbian

Media Info

  • Pagination: p. 25-29
  • Serial:
    • IZGRADNJA
    • Volume: 42
    • Issue Number: 10
    • Publisher: Savez Gradjevindkih Inzenjera I Tehnicara Jugoslav
    • ISSN: 0350-5421

Subject/Index Terms

Filing Info

  • Accession Number: 00612033
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: ITRD, TRIS
  • Created Date: Aug 31 1991 12:00AM