NEW AUSTRIAN TUNNELLING RECORD

This article describes a new Austrian tunnelling record established at the Heinfels hydro scheme in Ost-Tirol. This record was established with a Robbins TBM type 1014-250. This machine has a diameter of 3.2 m and an array of 24-17 in disc cutters. The best performance was 104.5m in 22 hours -- a record achievement, especially in quartz-phyllite layers. Lining details of the tunnel and the contractor's strategy are discussed.

  • Availability:
  • Corporate Authors:

    Morgan-Grampian (Construction Press) Limited

    Morgan-Grampian House, 30 Calderwood Street
    London SE18 6QH,   England 
  • Authors:
    • BRAUN, W
  • Publication Date: 1991-4

Media Info

  • Features: Figures; Photos;
  • Pagination: p. 34-35
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00610010
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Jun 30 1991 12:00AM