TECTONIC ROCK FORMATION AND BLASTING OF CUTTINGS AND CUTS AND FILLS IN FRONT OF THE TUNNEL (ON THE EXAMPLE OF THE RIPCA TUNNEL ON THE BIHAC-DONJI LAPAC ROAD). PROCEEDINGS - 1ST YUGOSLAV SYMPOSIUM ON TUNNELS, VOLUMES 1 AND 2

TEKTONSKI SKLOP STIJENA I MINIRANJE PREDTUNELSKIH USJEKA I ZASJEKA (NA PRIMJERU TUNELA RIPCA NA CESTI BIHAC-DONJI LAPAC)

The bihac-ripac-donji lapac road tunnel, together with cuttings and cuts and fills, was constructed in 1977 by the geological institute of ljubljana in collaboration with the "viadukt" construction firm from Zagreb. The paper reviews tunnel design, its construction and necessary drilling and blasting works. It also analyzes the influence of tectonics on construction. On the basis of the results obtained, it suggests structural and geological measuremants and rock tests to be peroformed in order to obtain necessary parameters for drilling and blasting design. For the covering abstract of the conference see IRRD 829277.

  • Corporate Authors:

    Savez Drustava za Tunele Jugoslav & Dru za Tun Hrv

    Rakusina 1
    Zagreb, Croatia,   Yugoslavia 
  • Authors:
    • Bozic, B
    • Braun, K
  • Publication Date: 1988

Language

  • Undetermined

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00606203
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: ITRD, TRIS
  • Created Date: Mar 31 1991 12:00AM